  1. It's hard to tell from geoOttawa, but I'm wondering if they've cheaped out on the pedestrian plaza outside of the entrance that was shown in the renderings. The area between both entrances looks empty. The supposed new underpass on the north side of the station isn't shown. I think this dates back to the original EA which highlighted an issue with the station being on a curve, which starts just south of the bridge. There's no way for a southbound train on the west track to continue south to Leitrim with the configuration shown. The track only leads to the Airport. Presu
  2. No idea when it would be built, hasn't gone to study yet. But it would connect the Baseline BRT to the rest of Heron, down Walkley, and then up to Elmvale following the Route 46, and also Industrial (where OC Transpo's garages are).
  3. It looks like the new draft official plan includes the at-grade transitway in some of its maps, e.g. in the Alta Vista secondary plan. https://engage.ottawa.ca/the-new-official-plan
  4. I don't think there's anything newer than the TMP.
  5. From the last construction update email that they sent out (on September 28):
  6. That's exciting! Thank you for sending in the emails. And done!
  7. I don't know if this was a change for the new vehicles, or if it's being retroactively applied to all of the older vehicles as well but 1138 has a panel above the door to cover the door electronics. Previously the electronics were completely exposed, not that I recall this necessarily being a problem. In any case; a good change.
  8. I could see Tenth Line being useful if that interchange ever saw proper development, but I have no idea how likely that is. OTC seems useless from the get-go.
  9. I'm not sure what's with the big difference for Blair to Trim (the weird curves east of Blair maybe?) but for the other's it's undoubtedly because of the flyover and switching required.
  10. To add a bit more confusion into the mix, here is a relevant excerpt of the project agreement:
  11. I think it's worth bringing this nice graph up again (from here ) I have to say I'm still fairly skeptical about these times, but I'm impressed with how fast they've been responding to you.
  12. I personally like the idea of running it along Queen Elizabeth, but Dodge the inevitable resistance from the Glebe in favour of a potential compromise from the NCC? ¯\_(ツ)_/¯
  13. Here it is on a map. You might be thinking of Fallowfield.
  14. Glad to see the Heron/Walkley BRT added! (although in the TMP it continues to Elmvale, and I think it's unlikely we'll ever see a Park and Ride at Walkley and Conroy)
  15. This isn't a matter of lowest bidder, it was all part of the original design. The track north of South Keys has a limited capacity meaning that trains can only run every 12 minutes. If trains continued on to the Airport, then that means there wouldn't be one headed to Riverside South for another 12 minutes and there'd be a 24 minute gap. With that said, South Keys will have an island platform so the transfer from the airport train to the main line train (or vice versa) is done by simply walking across one platform.
  16. In my opinion, I don't see the value added of a wiki along with the existing site(s) and its pages. Regardless of duplication of other sites and wikis, there's potential for duplication between a wiki here and the site itself. Anything that's missing from the site now could still be user-contributed just like a number of pages already are. If a wiki is added, I think it should take the place of the main site since that's where all the content is anyway. But I imagine that would be a big undertaking and of course I don't know how Shane feels about that.
  17. I can't think of any current active plan (maybe someone else can), but it is in the TMP. It would dip south below those houses before going back up to connect to Limebank though.
  18. A new bus loop would be built between the station and the 417. A new pedestrian overpass would be built to connect to the parking lots from what I would imagine would be the "fare-paid zone" by the bus loop.
  19. It's in RTG's best interests to get this done ASAP of course. Based on the description of the work being done, I'm sure it would otherwise have been done during overnight maintenance periods, but that likely would have spanned several months.
  20. I think this was one of the last things that was formally added to the project, though it was proposed early on. The freight crossing is just part of an agreement between CP and the City and I don't think it has anything to do with CP's current stakes in the Ottawa region. Definitely nothing to do with CN and their plan to abandon. The agreement was mostly just for "ensurance" that if CP ever had business to conduct in this region again, they'd still have some access to the corridor. That's very unlikely to happen though of course.
  21. The data's all here! https://github.com/dellisd/OTrainMap/blob/stack/data/stage3barrhaven.json But in order to display the several options for the alignment by West Hunt Club requires some extra work that I just haven't had the time to get around to finishing... Soon though.
  22. More or less, yes. You can see the entire planned alignment on the system map: https://map.otrainfans.ca/
  23. Any important part of it will be double tracked as they lay new track in the south. Any over/underpass will be built to accommodate double track south of South Keys station. The only single track section is between the crossover switch by South Keys station and Leitrim, but since the overpass over Hunt Club will be doubled (or rather, a second one will be built) the only thing to do to complete the full doubling is add a new switch before the Airport spur curves off and continue the track south to join the second track that starts at Leitrim. Bayview through Gladstone will also be doubled
×
×