.Good afternoon all

The following units were spotted at Tunney's Pasture yesterday at around 2:45pm

1107, 1109, 1121, *1116-1125 (*This was the only 2 car train) and a un-numbered unit

I got a couple of pictures to share as well. 

20190315_145815.thumb.jpg.92224c34b9949afd7f11f526f1a74eb6.jpg

20190315_145239.thumb.jpg.250b5757dd0dcadd61e014d6f60dadb6.jpg

  • Like 3
Link to post
  • Replies 97
  • Created
  • Last Reply

Top Posters In This Topic

Top Posters In This Topic

Popular Posts

Went back today to spot some more. Very interesting day today.  #1116, #1132, #1122, #1133, #1121, #1124, #1118, #1131, #1117, #1107, #1115 were rolling.  As for the tests it appears, they w

Went for a spot yesterday (April 1st) and last Thrusday (March 28th). Yesterday they were only testing double trains at a rate of one train every 7 to 10 minutes. Also speed of the Double trains seems

I took a short video at Bayview yesterday. With the escalators, the trains and the announcements it really felt like an active transit station yesterday afternoon. I can't wait for the system to final

Posted Images

  • Moderator
23 hours ago, DavidBellerive said:

 This leaves us with the following as missing, or on other sections of the alignment:

1101 - 1103, 1106, 1108 - 1113, 1119, 1127 - 1129 and 1134 (15 trains)

I spotted 1103 around Hurdman on February 14th (just found the note I made of it). 

  • Like 2
Link to post
  • Moderator
On 3/16/2019 at 3:05 PM, occheetos said:

I spotted 1103 around Hurdman on February 14th (just found the note I made of it). 

Noted on my side. Since I don't want to spam updated listing, I'll put it as part of the next update.

  • Like 1
Link to post
  • Moderator

I was out earlier today at Tremblay Station around 12pm, and I saw the following trains pass: 1112, 1124, 1131. I was only there for 5-10 minutes train spotting. 

They seemed to be operating at a 5 minute interval in both directions.

 

  • Like 2
Link to post
  • Moderator

Seen on Reddit earlier today, interesting observations.

Reddit

Basically, max track speed would be 90km/h, not 80. Today 20 vehicles were on the line at the same time, and they are back to a higher speed profile. So it seems we are at a point where the system can run sufficient vehicles at the same time (regular operation will be 15 "vehicles"), and able to function at the time intervals expected!

Link to post
  • Moderator
1 hour ago, Matth69000 said:

Spotted #1104, #1103, #1122, #1129, #1116, #1112, #1125 around 9PM Thursday. I don't really know where we are in the countdown of trains but I feel like 12 Days end-to-end  testing  testing isn't far away.

Spotted the same units earlier during the day, with 1105 and 1107 coupled. The count I am maintaining is now at 24 vehicles spotted, ten missing.

The pace today was really impressive, easily a train every 4 minutes. Unfortunately, forgot to keep count of how many concurent units, but almost all of them had the passenger info systems on, and the “next train” display functioning.

 

Units not yet spotted on the alignment as of March 21st.

1101, 1102, 1106, 1108, 1110, 1111, 1119, 1127, 1128 and 1134.

Link to post

Hi there,

I only want to ask if you think that all the trains have been built by now.

I am trying to evaluate where D-Day, or rather O-Day, might fall.

It is supposed to be in this second quarter of 2019... between now and 30 June.

But we've seen dates come and go before.

Is there any assurance or guarantee that Line 1 of the O-Train will carry passengers before Canada Day?

Phil in Orléans

 

Link to post
  • Moderator
4 hours ago, Phil said:

Hi there,

I only want to ask if you think that all the trains have been built by now.

I am trying to evaluate where D-Day, or rather O-Day, might fall.

It is supposed to be in this second quarter of 2019... between now and 30 June.

But we've seen dates come and go before.

Is there any assurance or guarantee that Line 1 of the O-Train will carry passengers before Canada Day?

Phil in Orléans

 

All 34 of the initial LRV's are complete and from the last FEDCO update, almost all of them have gotten all the required certifications.

They've also started assembling LRV's 35-38 which are additional trains that the city ordered.

Link to post

Went for a spot yesterday (April 1st) and last Thrusday (March 28th). Yesterday they were only testing double trains at a rate of one train every 7 to 10 minutes. Also speed of the Double trains seems to now match-up with that of the single trains. Enjoy the Video, I'll try to make more before the line opens ? !
P.S : I love the noise of these trains, almost subway like !

 

  • Like 3
Link to post

Yeah was driving westbound on Scott street coming up to Bayview station and I was parallel to a double-linked tram. Clocked it at 60 KM/h exactly as we were approaching City Center then it slowed down as I don't imagine he was about to roll into the station from 60 to 0! ?

  • Like 1
Link to post
  • Moderator

Great pics. Lees is turning into quite a good spot to snap photos thanks to the curve in the track, overpass and pathways. 

Tremblay is also another good spot. The testing is really running at full steam now. 

Link to post

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now

×
×
  • Create New...