Jump to content
View in the app

A better way to browse. Learn more.

Rail Fans Canada

A full-screen app on your home screen with push notifications, badges and more.

To install this app on iOS and iPadOS
  1. Tap the Share icon in Safari
  2. Scroll the menu and tap Add to Home Screen.
  3. Tap Add in the top-right corner.
To install this app on Android
  1. Tap the 3-dot menu (⋮) in the top-right corner of the browser.
  2. Tap Add to Home screen or Install app.
  3. Confirm by tapping Install.

McGill Station - Connection between the Metro's Green Line and the REM

Featured Replies

  • Mod Squad

McGill station on the REM will connect to the Metro's Green Line. Detail on this is not completely clear at this point. From my understanding, the REM will pass perpendicular to the Green Line but further down in depth. Does anyone have any information or any diagrams of how these two stations will end up connecting? 

While knocking out a wall to make an access corridor is always a possibility, this is quite a large volumous station, so it will be very interesting to see what the final solution is, and how it is constructed, without impacting the existing station too much or the operation of the Green Line.

The REM website gives this information on the station "McGill station will be beneath McGill College Avenue in the very heart of downtown, and will offer access to Montréal’s green metro line and its extensive underground shopping and restaurant network (RÉSO). It will also be connected to the Montréal Eaton Centre and Place Montréal Trust."

https://rem.info/en/montreal-downtown

https://rem.info/en/integrated-network

  • Replies 2
  • Views 695
  • Created
  • Last Reply

Top Posters In This Topic

Posted Images

  • Mod Squad

Given the station will be located in what is essentially the Mount Royal Tunnel, and therefore under the current station. This was from when it was decided to add those downtown stations if I recall. If you look next to the Green Line, it seems to be a long hallway with a slope to McGill station. Since it is not as deep as Edouard-Montpetit, it seems to be an actual option, though that was before there was consultations regarding the constructions and community impact.

image.thumb.png.bf1280c2ef2d5e18b1c3d995bd3f7e5f.png

EDIT: Found this document for the CDPQinfra, dates from 2016 but shows another angler. It seems like the concourse will not allow people to go across, as they will have to go on the platform to reach the other side. https://www.cdpqinfra.com/sites/cdpqinfrad8/files/medias/pdf/rem_cdpqinfra_bref_tech_en_161125.pdf

Edited by DavidBellerive

I'm disappointed with the layout of the REM/Metro station. It reminds me of Bayview's layout, only with a far higher volume of passengers. 

Join the conversation

You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.

Guest
Reply to this topic...

Recently Browsing 0

  • No registered users viewing this page.

Account

Navigation

Search

Configure browser push notifications

Chrome (Android)
  1. Tap the lock icon next to the address bar.
  2. Tap Permissions → Notifications.
  3. Adjust your preference.
Chrome (Desktop)
  1. Click the padlock icon in the address bar.
  2. Select Site settings.
  3. Find Notifications and adjust your preference.