April 13, 20215 yr Station highlights from the latest Stage 2 east update: https://ottawa.ca/en/planning-development-and-construction/major-projects/stage-2-light-rail-transit-project/project-updates#stage-2-o-train-east-extension-spring-2021-information-session Jeanne d’Arc Station Construction on the future Jeanne d’Arc Station will start in May 2021 with a completion target date of January 2023. The station will be built at-grade with access to elevated boulevard and a multi-use pathway from Fortune Drive will also be accessible from the station. Improvements to the intersection north of the future station are being made as part of the Stage 2 project. All traffic movement entering or existing the OR 174 will be controlled with a signalized intersection that will provide dedicated pedestrian crossing. Jeanne d’Arc Station Number of Entrances 2 Fare Gates 8 Elevators 4 Bike Parking Spaces 40 Bus Connections Yes
Join the conversation
You are posting as a guest. If you have an account, sign in now to post with your account.
Note: Your post will require moderator approval before it will be visible.